| Day four - Starting to take shape |
|
After finishing in the garage yesterday I just couldn't bring myself to do an update. Looking at the build guide and other build pictures it looked like my pedal box was incomplete as the clutch mounting point was missing. I spoke to Marc this morning and was reassured, Marc has redesigned the pedal box to improve the clutch feel and reduce the possiblity of stalling. Today's build went well, both fuel lines are in, I've left them unclipped in the engine bay and rear section as I'm not sure where they should go yet. I've found that it's easier to drill the chassis with a smaller drill and step up to the 5mm for the larger rivets. By using a 3mm pilot I've gone 3 days without breaking a drill bit or blunting one! I've started to clip up the wiring loom but I'm not happy with the mounting method so I have to sort something else out. I've started to notch the rear panel, just some minor triming and it's done. One thing I have noticed from the build manual is that it's not easy to see where pipes and cables route. I've taken a number of pictures as I've gone so that others have a reference. The build manual should really only be used as a guide, because Marc keeps updating the chassis the pictures become out of date very quickly. Build pictures from today
May 20th23 Media. 189x hits 206x hits 177x hits 182x hits The diff, near where it will go. 170x hits 172x hits Pedal box with master cylinders fitted 163x hits 166x hits 168x hits View from the front of the car down the tunnel 177x hits 182x hits 144x hits 164x hits 175x hits 148x hits 147x hits 145x hits 145x hits 156x hits 156x hits About to drill the hole to mount the pipe 154x hits 167x hits Magnetic tray, best purchase ever 153x hits |


